Kitchen
Two decades, 600+ delivered projects, a 38-person crew, and a single license — CGC1530409 — on every permit. Family-owned. Bonded. Insured to $2M general liability.
A detached cabana & ADU in West Kendall — slab, framing, wet trades and finishes, all under one CGC1530409 permit. Full kitchen with bar seating, impact-rated sliders that open the room to the pool deck, and a barrel-tile roof matched to the main house. 18 weeks on site, hand-off on the day we promised.
Walk-through · 0:56
Exterior
InteriorFrom a 48 sq ft powder room to a 4,800 sq ft whole-home gut. All eight run under CGC1530409, scheduled by the same PM bench.
We build four things well and don't pretend to do everything. Here's the range, with real projects behind each.
Kitchen
Bathroom
Room Addition
ADU
Bathroom
Kitchen
Kitchen
Bathroom
Kitchen
Room Addition
ADU
Room Addition
Six stages, written into every contract. The PM doesn't move us forward until you sign off on the last one.
Project managers, lead carpenters, tile leads, designers, and a permitting office — all in-house, all on payroll, none subcontracted on critical trades.








Showroom floor · cabinet runs & finished kitchens
Klassikasa — our sister design center in Dania Beach — keeps the actual samples you'll choose from. Walk full cabinet runs, see slabs under daylight bulbs, touch real vanities and finished tile installs. Bring your floor plan; 3D design is on the house.
Five things every Florida homeowner should verify before signing a bathroom contract. We make ours public and clickable.
Active build calendars across Miami-Dade, Broward, and Palm Beach — and a permit office that knows each city's plan-review desk by name.
The bathroom you keep putting off doesn't have to wait for a lump sum. Through Hearth and GreenSky we offer 0% financing for 18 months on qualified projects, so you can start the gut remodel now and spread the cost over the year and a half instead of living with the mildew and the 1970s tile another summer. We'll walk you through the options at the estimate and there's no obligation to use them.
Drop a short note about the project. Your message routes directly to the PM whose calendar matches your service and timeline — not a generic sales queue.